:: home :: back::

:: www.invest-in-serbia.com ::

 
Technical Secretariat Pan-European Transport Corridor X
Detailed Maps of the existing and projected situation of Rail Corridor X

Status of Rail Corridor X
Double track alignment (actual -%)
Double track alignment (projected - %)
Traction system (actual)
Traction system (projected)
Capacity (actual)
Capacity (projected)
Maximum design speed (actual)
Maximum design speed (projected)
Allowed weight per axle (actual)
Allowed weight per axle (projected)
Passenger trains per day (actual)
Passenger trains per day (projected)
Freight trains per day (actual)
Freight trains per day (projected)
Annual number of passengers (actual)
Annual number of passengers (projected)
Annual freight carried (actual)
Annual freight carried (projected)
Annual passenger trains at cross borders
Annual freight trains at cross borders
Mean estimated delays at cross borders for passenger trains
Mean estimated delays at cross borders for freight trains
Freight trains commercial speed
Passenger trains commercial speed
Accidents per kilometer
Land type
Level of maintenance
Signaling system (actual)
Signaling system (projected)
At level crossings (actual)
At level crossings (projected)
Source:

:: home ::

:: - ::

© Copyright 2001-2002 IISA. All rights reserved.