|
21. March 2003 - Friday |
Hydroelectric power plant Djerdap I produces 20 to 22 million kWh daily
Due to larger than expected water flows of 6,800 m3/s, the hydroelectric power plant Djerdap I, located near Kladovo, produces 20 to 22 kWh daily, 21% above planned levels.
Hydroelectric power plant Djerdap II, located near Negotin, produces 4.5 million kWh daily.
|
|
|
|
|